I didn’t get Miranda out of the driveway today, but I’m otherwise on schedule for a Wednesday departure.
Three things delayed me today:
1) needing to figure out how to load my new toad (could be improved)
2) having to pass a wire from the back of the rig to the dash (will explain this when I show off the tow bar set up)
3) the shortness of the day (it’s dark at 4:00 here now)
The very warm weather was a real blessing. I would have liked comparable weather for my running around tomorrow, but I’ll take what I can get.
I dropped off my truck off at the shop at 3:30 and gave instructions for the tow bar stuff. Most of that will be done first thing Wednesday when the RV is there, too. They say the baseplate setup and electrical installation will take a full day.
If all the work is done by noon Wednesday, I’ll leave from the shop and head for Saratoga Springs. Otherwise, I’ll delay departure for Thursday morning.