AM Solar At Last!

I pulled out of Eugene in light rain at about 8:10 this morning and made it to AM Solar at bang on 8:30 in time for my appointment. I was very pleased with the warm reception. We took a few minutes to go over the rig and discuss where the wiring was going to go in and the charge controller would be mounted. I also pointed out the location of the batteries and 12V disconnect switch.

The work will take all day because they are working on two rigs, but this is okay since I was offered a place to park for the night… including access to a shower. I’ve been dry camping for over a week, so a long shower is going to be appreciated tonight!

Getting ‘solarized’ has been a dream for two and a half years and I can’t believe this is happening at last!