Dry!!!

The loft is now bone dry! WOOHOO!

*ahem*

Until I finish doing that exterior corner in Eternabond, I’m not finalizing anything inside. Instead, I’m slowly starting to acquire materials and cutting them to fit so that once I’m sure the corner is watertight, I’ll only have some gluing, stapling, screwing, and caulking to do.

The dehumidifier and heater are so efficient that I think that if I can get a coat of primer on before noon, I’d be able to put on a coat of paint before bed, saving me a day. Suddenly, there’s an end in sight. I’m thinking that this night next week I could very well be sleeping in my bed again.

In case anyone is wondering, I got ALL the black, rotted wood out. Everything else has dried to normal wood colour and is mildew-free and solid, so I have a good foundation for the repairs. I’m so excited to move forward with this!